1ST CHOICE FIRE — LOCAL PERMIT AND CORRECTION CLOSEOUT PREPARATION BEFORE QUOTING - Verify the actual parcel jurisdiction, building/fire reviewer and water utility. - Gather architectural/ceiling plans, existing sprinkler drawings, calculations and available supply data. - Include the complete notice/report, original item numbers, actual deadline and permit references. - Identify the owner/GC contact, related trades, access and occupied-building constraints. BEFORE WORK - Agree the written sprinkler scope, assumptions, fee and availability. - Confirm applicable design/permit requirements and local contractor/technician qualifications. - Identify required review and inspection hold points before covering work. - Coordinate any impairment/shutdown under the property's procedures with qualified personnel. - Obtain authority confirmation of any requested deadline change; a quote does not extend a deadline. CLOSEOUT - Record each notice/report item's disposition and any unresolved work. - Collect correction records and applicable inspection/test/retest evidence. - Ask the testing provider/authority who verifies and submits the corrected record. - Retain applicable acceptance/submission receipts and as-built information with the owner's records. - Confirm the next inspection obligations with the qualified provider and agree any follow-up arrangement. For fire or immediate danger, call 911. The online quote form is not emergency dispatch. Request scope: https://1stchoicefire.com/correction-notice