FIRE-MARSHAL CORRECTION NOTICE
Got a 10- or 30-day notice?
Send it. We'll quote each line by Friday.
Upload the notice, tell us the AHJ and the re-inspection date, and we'll come back in 48 hours with a numbered quote that maps 1:1 to the line items the inspector wrote. No back-and-forth, no rescoping calls.
RE-INSPECTION COUNTDOWN
Most AHJs in Pierce County will accept a written contractor commitment to a permit pull date as a stay on the original deadline. We can ship that letter the same day we receive your notice — even before the formal quote.
WHAT WE'LL DO IN THE NEXT 48 HOURS
Four steps. Each one moves the clock.
Receive
Notice logged, AHJ identified, contact roster set. You get a confirmation text with a job number.
Scope
Mike walks each NFPA line item with you. We confirm scope, photos requested if needed.
Quote
Numbered scope letter. Each correction maps to an NFPA chapter. Permit pull date committed.
Schedule
Permit pulled, work scheduled, re-inspection booked. We talk to the inspector — you don't have to.
COMMON CORRECTIONS WE QUOTE WEEKLY
- Missing or painted-over headsNFPA 25 §5.2.1.1
- FDC cap missing / damagedNFPA 25 §13.7.2
- Backflow inspection past dueNFPA 25 §13.5
- Riser room access blockedIFC §901.6
- Hydrant flow re-test requiredNFPA 25 §7.3
NO-FORM PATH
Rather just talk?
Text or call us a photo of the notice — we'll do the rest. Real human answer during business hours, on-call after.