Skip to main content
WA L&I #1STCHCF770OFActive leak?Call 253·876·5755
1st Choice FireBONNEY LAKE · WA

FIRE-MARSHAL CORRECTION NOTICE

Got a 10- or 30-day notice?
Send it. We'll quote each line by Friday.

Upload the notice, tell us the AHJ and the re-inspection date, and we'll come back in 48 hours with a numbered quote that maps 1:1 to the line items the inspector wrote. No back-and-forth, no rescoping calls.

RE-INSPECTION COUNTDOWN

14
DAYS
00
HOURS
42
MINUTES
14
SECONDS
until re-inspection · May 27, 2026
WHY THE CLOCK MATTERS

Most AHJs in Pierce County will accept a written contractor commitment to a permit pull date as a stay on the original deadline. We can ship that letter the same day we receive your notice — even before the formal quote.

WE'LL CALL - NOT EMAIL - WITHIN 4 BUSINESS HRS

WHAT WE'LL DO IN THE NEXT 48 HOURS

Four steps. Each one moves the clock.

01 · WITHIN 4 HOURS

Receive

Notice logged, AHJ identified, contact roster set. You get a confirmation text with a job number.

02 · BY DAY 1, EOD

Scope

Mike walks each NFPA line item with you. We confirm scope, photos requested if needed.

03 · BY DAY 2, EOD

Quote

Numbered scope letter. Each correction maps to an NFPA chapter. Permit pull date committed.

04 · BEFORE THE DEADLINE

Schedule

Permit pulled, work scheduled, re-inspection booked. We talk to the inspector — you don't have to.

COMMON CORRECTIONS WE QUOTE WEEKLY

  • Missing or painted-over headsNFPA 25 §5.2.1.1
  • FDC cap missing / damagedNFPA 25 §13.7.2
  • Backflow inspection past dueNFPA 25 §13.5
  • Riser room access blockedIFC §901.6
  • Hydrant flow re-test requiredNFPA 25 §7.3

NO-FORM PATH

Rather just talk?

Text or call us a photo of the notice — we'll do the rest. Real human answer during business hours, on-call after.

253·876·5755Request Quote