NFPA 13 vs 13R vs 13D — which standard governs your project?
Understand the purpose of the three sprinkler standards and the project information needed to choose the applicable design path.
Search 14 source-checked guides.
1–6 of 6 guides for “NFPA”
Clear search and filtersUnderstand the purpose of the three sprinkler standards and the project information needed to choose the applicable design path.
Connect report findings to the affected equipment, the actual deadline, and the correction and closeout records.
Record useful sprinkler-head information and recognize when changes need qualified review.
Prepare environmental and system information for a qualified review of wet- and dry-pipe sprinkler options.
Identify your system's actual inspection program, gather its records, and coordinate testing and deficiency correction without assuming a universal annual schedule.
Washington's adopted residential code, the distinction between townhouse and one- or two-family rules, and the facts your local reviewer needs.
Download a checklist for your project.
Gather the address, drawings, scope, and project dates.
Download checklist (TXT)Collect system records and arrange access with your inspector.
Download checklist (TXT)Give your remote and local teams the same project starting point.
Download checklist (TXT)Confirm actual requirements with your qualified team and reviewing authority.